Alstom: contract with RATP for its I-CBTC solution
(CercleFinance.com) - Alstom has announced that it has been chosen by RATP to supply its I-CBTC on-board automatic control system for lines 10, 7bis, 3bis and 3 of the Paris Metro.
Up to 91 of trainsets the new MF19 trains will be equipped with this solution.
The firm tranche of the contract includes the adaptation of the I-CBTC solution and its deployment on lines 10, 7bis and 3bis (44 trains). Conditional tranches may be lifted by RATP, such as the deployment on line 3 (47 trains).
Alstom will carry out the development, validation, industrialisation, installation, testing and commissioning of its I-CBTC solution. Three sites in France will contribute to this project; Aix-en-Provence, Saint-Ouen and Villeurbanne.
Copyright (c) 2021 CercleFinance.com. All rights reserved.